Friday afternoon, while I was in the workshop installing the final trolley wire support arm, I had a feeling come over me that the layout was now done. Done in the sense that all the things I wanted to appear on the layout were now in place, the trolley ran, and the layout could be shown to civilians in the right setting.
The old saying that a layout is never really done I can see applying here even though I've declared the layout done. There'll still be primping, tuning the details here and there, and maybe even adding some minor ones. And there's the stand that needs finishing, but it's the stand.
So, it's done.
Genesis of a Micro-Layout
This layout has been a long time in the making. I first had the idea of building something inspired by the Mt. Lowe railway back in 2014 after a stay in Pasadena. However, I had no idea how to proceed.
In the spring of 2015 we visited the Los Angeles area again and I was able to hike a portion of the Mt. Lowe trail in the San Gabriel mountains which runs along the old roadbed of the Mt. Lowe railway. Bad weather and scheduling constraints prevented me from hiking the entire route.
Throughout 2015 and 2016 I toyed with the idea of building a Mt. Lowe inspired layout in N-scale. Strangely enough as a test piece for the layout I built a model of the railway's observatory. Nothing else came of that layout idea.
It wasn't until January 2020, just before the pandemic, that I was able to return to Mt. Lowe and resume hiking the trail. Again, I was only able to hike part as ice and snow made the trail a bit too risky for me. Near the end of that trip I caught what we now know as covid-19, but at the time no one knew exactly what it was. I had a miserable flight home and from news reports we watched I expected to be quarantined when we landed in Montreal. That didn't happen, but I was so sick I stayed home for about three weeks.
In the fall of 2023 after reading a few interesting pieces by Bill Schopp on trefoil shaped layouts in some old Railroad Model Craftsman magazines a light went on in my head and I finally had an idea on how to build a layout that captured what I wanted to express, and wouldn't take years and years to construct. By this time I had also dabbled with micro-layouts for a few years. My experiences with the Loonar Module and the Centennial Experimental Farm had opened my eyes to other forms and approaches that could allow me to express things I previously found inexpressible.
Instead of starting with an observatory I wised up and started the layout by building a trolley inspired by Thaddeus Lowe's personal trolley. The scale was S and the gauge 9 mm. It took a lot of thinking before I settled on that scale and gauge. Things like how I could build a viable trolley from commercial drive units, support tight curves on the layout, deal with steep grades, availability of figures and scenic accessories, provide adequate clearances, and so forth factored into the decision. By starting with the trolley this gave me a vehicle to test grades and curves to see how steep they could be on the layout, and assess what sort of clearances and dimensions I'd need. This was very important, so much so that I'm thinking of writing a future post on general trefoil layout design principles and the necessity of testing designs with rolling stock.
In June 2024 I finally made a serious start on the layout. By the end of June the track was installed and the trolley could run along it. And, you may not believe it, but the area of the layout's footprint is 4 square feet, the upper limit on micro-layout size.
Building up the terrain was a long process. The big new technique I learned on this project was casting rock molds from latex and later using them to create the layout's rocky terrain. The mountains' basic form though was built up from styrofoam sheets. By August 2024 the final shapes were starting to emerge; by September the shapes were defined enough to begin solidifying the mountain structure and do final shaping with spray foam.
October 2024 was more-or-less dedicated to surfacing the mountain with Cel-U-Clay, making use of the latex rock molds. Creating the mountain surfaces was a big job and continued well into December. I kept working on the mountains into January of this year, but by this point I was wrestling with painting the mountains as shaping them was wrapping up.
You know, for a guy who considers himself a structures guy, I didn't start building structures until February. I started with the station at Poppyfield Flats because it seemed the simplest to me, and then went on to build the lookout at Inspiration Point, and then what I considered the most difficult structure, the Circular Bridge. The last structure, the Observatory, was almost an after thought to help sort out a design problem, unlike the observatory on the ill-conceived N-scale layout which was the first thing I built.
Amongst all the structure building there was a considerable amount of tree 'manufacturing'.
Later, much, much later, I built a simple passenger car for the trolley to pull.
Interspersed amongst all these significant projects was a lot of detail work. There was construction and installation of trolley wire support poles and arms, trolley wire installation, tree installation, layering on of ground cover and bushes, and lots of odds-and-ends work that is too persnickety to write about.
Again, much later during construction, in August, I changed my mind on how the layout should be powered and controlled. At first I merely provided a power jack for an external controller to plug into, but came to think the controller's power cord would inhibit play. I then scratchbuilt a battery-powered controller into the side of the layout so it would have stand-alone power and control. On a future project maybe utilizing some sort of wireless handheld controller would be better.
Now, all this may make it sound like I had a master plan right from the get-go and simply followed it to the end without any hiccups. I did have plans at the beginning. I wouldn't start a project like this without them, but once I got started there were lots of detours, changes of mind, conundrums that left me stumped for awhile, times when I just stared at the layout and thought about its design, mistakes, fumbles, and realizations about things I'd do different next time. Many of them are documented in the posts that can be found stamped with the Mt. Lowe tag. Some I'll take to the grave :-)
What's Next
Taking photographs to capture what's in my mind's eye is on the horizon and could last for a few months. Then there's the lead up to Christmas. I want the layout to be looking and behaving its best so I can show it off during the holiday season.
The Future