The 30Squares Media Empire let the lease expire on the HQ, and a new tenant is getting ready to move in.
Tuesday, May 31, 2022
Eldon moves in
Monday, July 12, 2021
The HQ's exterior is done!
I figured I'd get the lead out and at least finish the HQ's exterior before jumping into some new projects.
And it didn't need much, just some steps and a sign.
I had bought some self-stick foam letters a long time ago and thought they might look good on this project. I picked out the ones I needed and stuck them to some styrene strip as a base. The base was then stuck to a styrene I-beam for attaching the whole thing to the facade.
The letters are painted with Tamyia copper paint left over from the roof of last year's Weekly Herald project.
Wednesday, May 19, 2021
The HQ gets a removable roof
I think roofs are odd things in HO scale buildings. In real life down here at ground level we often don't see much of roofs, and when we do they usually aren't the main attraction.
On a layout we observe our little HO world like giants. We're confronted with acres and acres of roofs in all their glorious detail. The sight of all those roofs should make it clear that we need to configure our layouts so they stand near eye level.
Ok, that's my pre-coffee rant, and my my way of saying why I don't like to spend much time on roofs.
Now that's out of my system, with coffee in hand, let's look at the HQ's roof.
The roof trusses were glued to the underside of the roof. This takes a bit of careful alignment because the kit's roof is non-removable, and is installed by first gluing the trusses to steel columns inside the building and placing the roof panels on top.The trusses need to be spaced so that they will go around the outside of the elevator shaft.
You can see that I had to notch the roof's corners so the assembly wouldn't interfere with the building's corner pilasters. I think I the notches are a little too big, but they're not visible.
Along the ridge I glued on a strip of 0.010" styrene, and off to the side is a Walther's air conditioning unit from their roof-top accessories kit. The a/c is placed so it's directly above the elevator shaft.I often add air conditioners so I have something to hold onto when I'm removing a roof, and that's why I added one to this project. The a/c is attached to the roof panel with plastic solvent, so when dry it's solidly held in place and can resist handling.
Lighting is from two LED strips that have been stuck in channels built up from 0.020" styrene sheet. The short strip is located at the front, and in retrospect I should have made it as long as the one at the back. The wire leads snake down the elevator shaft and out through a hole in the building's floor.To finish off this side the roof panels were brush painted with some gloppy white acrylic to improve the interior's reflectivity.
I make no claim to this looking realistic, and I tend to let the paint move and settle as it wants to. I'm more concerned with achieving an interesting pattern more than anything else.
Argh, I see I haven't set the roof's front edge properly. That'll need a little touch-up painting along the edge and some adjustment.
Not much more to go to finish this. There're a few interior detail parts I need to order, but I think I'll finish off some inside wall detailing on the upper floor while I wait for delivery.
Tuesday, May 4, 2021
Don't let the sound of your own wheels drive you crazy...
... especially if they're in your head*.
I keep thinking about the various details I should add to the ground floor. Support columns here, shelves there, a workbench in the corner, and on and on.
But I realized the project has gone on a little too long and decided to just glue up the walls and elevator-floor insert and get on with original plan: creating a removable roof and detailing the second floor.
That upside-down tobacco can is an item from my father's workshop filled with nuts and bolts just as he left it. Makes for a fine weight for holding stubborn parts while glue sets. In this case it's sitting on top of the elevator shaft to hold it square to the floor and walls.
Elastic bands hold the corners together.
The model was left this way for a day to allow the glue to fully set.
Afterwards, the concrete caps were glued to the tops of the walls, and a lot of touch-up painting was done to the foundation, wall caps, walls, and window sills.
The next step will be to install the removable roof.
Take it easy and stay tuned.
*with apologies to the Eagles :-)
Saturday, May 1, 2021
Checking
I thought I'd put the HQ on the layout and see how it sized up against the others on the street. I should have done this at the start of the project, but for some reason it never occurred to me.
For something that started off as an N-scale kit it seems to fit into the overall scheme of things all right. Although, I'm not going to squeeze the finished model cheek-to-jowl between some other buildings or the point of those big windows will be defeated.
I see a few painting problems that I'll need to clean up. And it looks like it'll need some sort of stairs up to the street level doors - there'll be a serious tripping hazard without them :-)
Tuesday, April 27, 2021
Ground floor detailing
Once I wasn't feeling as fatigued from the vaccine I went back to working on the HQ's ground floor detailing. When all the walls are in place it will be hard to access the ground floor, so I needed to do as much as I could before the other two walls are glued in place.
The light is an LED strip with a couple of leads soldered on.
Either way, a old watercolour cast-off was cut up for these pieces, glued to some scraps of 1/8" artist board so the art would stand-off from the wall, and then finally glued to the wall with some Weld Bond.
I'd have to say that this interior is something of a caricature. It's less detailed and not as grimy as a real equivalent would be, but hopefully I've added enough elements to make it pop as 'real' once everything is in place.
Sunday, April 18, 2021
Completed the elevator and utilities block
After setting aside the Jimmy project I felt the urge to go back to the 30 Squares HQ conversion. The job I had been putting off was finishing the elevator and utilities block. I was getting all wrapped around the axle about dimensions and fit and was avoiding this step over fears of screwing it all up. This was a clear violation of principles 1 and 3 :-)
The two wall pieces are built up from 3 pieces of 0.020" sheet styrene. The middle layer is the door layer, and each door has a window opening so one can see if you're going to crash into someone when you open the door.
I must admit this is a dumb way to build this wall. I should have cut the entire upside-down-T shape of the separating wall from a single piece of styrene. And if you're considering this project, it's something to keep in mind. I did what I did because I couldn't decide how many tenants the building should service, or what the ground floor plan should logically be. I just made up the design as I went along as my thoughts on the design changed. I will say this though, using styrene is forgiving if this is one's design approach.
Although, you'll see some nasty gaps between the wall edges and the elevator because my laminates weren't that square. I later filled those with putty. The important thing at this stage is to make sure the bottom of the walls rest completely on the ground surface.
The room walls are cut from single pieces of 0.040" styrene, and the trim is 0.020" x 0.040" strip stock. When I built up the rooms and glued them to the elevator block, I reinforced the inside corners with strips of 0.060" x 0.060" styrene.
Saturday, March 27, 2021
Updating the back wall
In the last instalment I ended the post by mentioning that I wasn't that happy with the door arrangement on the back wall.
I eventually realized I wasn't going to be happy with this project if I didn't go back and try to fix what was irritating me. So that's what I did.
Second, some pieces of styrene brick sheet were cut to fit over the side doors and then glued in place.
Saturday, March 20, 2021
Walls and Windows and CURRENtoons
In the last instalment of the 30Squares HQ build I stopped at the point where I needed to think a bit about how to proceed with the interior.
I thought and thought and thought.
Eventually I settled on a two floor arrangement with an elevator between stories.
The ledge was set 2 scale feet below the second floor window sills. I think this makes the windows a little too close to the floor, but there isn't much room as some space needs to be left for gluing the first floor window frames to the walls.
Once the ledges were installed, 0.125" square styrene verticals were glued to the inside of the wall pilasters to give some dimensionality to the wall surfaces. Verticals will also be installed on the second floor after the second floor is glued in place.
One thing to note about the vertical pieces is that the surface that abuts the wall needs to be slightly notched so the vertical will fit into the base when the wall is glued to the ground floor.
The second floor is cut from a sheet of 0.040" styrene.
The square grid I've penciled on the piece is a projection of the grid formed by the wall pilasters. I used them to help me think about where to place the elevator shaft, which will be a square section column placed in the opening.
The elevator shaft will only fill the back half of the opening, and will leave a square opening in the floor so that persons on the second floor can see down to the ground floor - and vice versa of course :-) I'll need to add a second floor railing for safety's sake.
At this point I decided to move on to painting the walls.The insides were painted with Tamiya XF-76, Gray Green.
Although, I did make a couple of modifications to the process.
First, on the Weekly Herald I primed the walls with a spray of Tamiya's white surface primer, but I didn't do that here. This kit's walls are a light brown colour instead of an acid yellow, so I thought it was ok to work directly on the pieces (recall that I had washed them in the last instalment in order to remove any traces of mould release).
Second, I mixed the brick colour using Revell Aqua Colour instead of Model Master acrylics. As you may know, I'm trying out new acrylics since Model Master paints have been discontinued.The brick colour mix I used was Revell's 36137, Reddish brown, and 36162, Mossy green. The green is to dull the brown to a more weathered bricky colour. I mix the paint on my palette to keep the colour loose, and the ratio is about 3 reddish brown to 1 green. Once the base brick layer colour was painted on, some thin washes of gray, reddish brown, and flat black were applied for further weathering. The result isn't superdetailed bricks, but something more impressionistic.
I haven't trashed my remaining Model Master paints. I used their Aged Concrete Flat for the window sills. I use this paint a lot in my practice and bought what my local hobby store had left. I'm sorry to see it go, but I think I can mix a substitute from Revell's 36189, Beige. Who knows, it might be even better than what I've been using!
Finally, the window frames were sprayed with Krylon Colormaster Hunter Green Satin. I don't know if that product is still available. I had a can on the shelf, and when a 10C day presented itself, I gave the window frames a spray. The thought of brush painting them all seemed a little too masochistic.To each piece of 'glass' I inked in a border with a Sharpie pen. The border helps to neaten the interior, and hide the bond to the window frame. They were glued to the frames with Weld Bond.
The individual window panes seem a little too big for HO-scale, but they afford good views to the inside.
After painting, and then gluing in all the window components, I really wanted to see how this thing looked. So I decided it was time to get hammered!
No, not that, this: I glued the entrance wall to a side wall, and then glued that assembly to the ground floor, using strategically applied hammers to hold the thing while the glue dried.
I don't use these old ball-peen hammers for hammering much these days. They're relics from my father and grandfather, but they come in handy at times. Although I wouldn't recommend this technique if animals or small children are running around, as these are precariously balanced.
![]() |
| Left: A stack of '70s CARtoons; Right: A few of today's CARtoons |

















































