![]() |
| 2003 Dover reprint of 1942 original published by W. W. Norton |
![]() |
| Model of the S.S. Prince Edward Island at the Maritime Museum of the Atlantic. She was a ferry that could carry 12 railway cars. |
![]() |
| Some issues of Model Ship Builder from 1982. Bought at BMV |
![]() |
| 2003 Dover reprint of 1942 original published by W. W. Norton |
![]() |
| Model of the S.S. Prince Edward Island at the Maritime Museum of the Atlantic. She was a ferry that could carry 12 railway cars. |
![]() |
| Some issues of Model Ship Builder from 1982. Bought at BMV |
After riding The Ocean to Halifax last year I toyed with the idea of building a model onboard if I were ever to take that trip again. I thought I'd build a small structure using a few simple tools, and materials that weren't messy, toxic, or had a bad smell. Classic cardboard and balsa construction came to mind. The idea was I'd start and finish the build in the time it took the train to go from Montréal to Halifax. Upon arrival I'd box up the model and mail it home before beginning my Nova Scotia travels.
Well, I'm unlikely to ever ride that train again, but I kept wondering if such a build were possible: a simple model, built with simple materials and tools, taking no longer than 22 hours - well, 25 if you include delays :-)
![]() |
| The FireHouse Iron Works as seen in May 2024, Whycocomagh, Cape Breton Island |
During the trip an old, somewhat dilapidated, and repurposed firehouse located in the town of Whycocomagh on Cape Breton Island caught my eye. I quite liked the size and shape of the building, so I thought this would be the one I'd try for a 22 hour classic card build.
Well, I might as well fess up right from the get-go: although it was a fun project in classic style, it took much longer to build than I thought. Ok, it didn't take 22 hours to build, probably only a handful of hours if you add up all the dots and blots of time, but they were sprinkled over a period longer than 22 hours. There was time waiting for glue to dry, waiting for paint to dry, and my usual humming-and-hawing about how to proceed with certain parts of the build. It all adds up. This was further complicated by the fact that there are basically three little buildings in this project, making it a more time consuming project than I had thought because of the number of parts to be made. And on the train I would have been diverted by sleeping, eating, and general lolling about and gawking out the windows for long stretches. I think a more feasible 22 hour project would be a single box structure with just four walls and a roof - maybe something like Marmora station.
And that is that.
So, would I build something similar in one of these overnight compartments on the Ocean (there's a fold-down table somewhere in that pile of stuff) ? Maybe, if it was a simpler project.
But, it also depends on the smoothness of the ride. I don't think it's up to 1972 Mercury Marquis Brougham standards :-)
![]() |
| Left: Model of the hydrofoil train | Right: Model of Comox torpedo |
Last week we were in Nova Scotia and had the opportunity to visit the Alexander Graham Bell National Historic Site. One of the many surprising things I learned while there was that Bell and his collaborators did extensive work developing hydrofoil vehicles. One collaborator, Casey Baldwin, came up with the idea of a hydrofoil train. I'll let the card accompanying the model take it from here: