Thursday, October 8, 2026
Wednesday, September 30, 2026
Enter the Growlery: Dead Tree Edition
![]() |
| Post-derecho remains of a pine tree with a 23" diameter trunk as seen in 2026. The internet tells me this tree could have been up to 115 years old! That age is sobering. |
'Sit down, my dear,' said Mr. Jarndyce. 'This you must know, is the Growlery. When I am out of humour, I come and growl here.'
'You must be here very seldom, sir,' said I.
'O, you don't know me!' he returned. 'When I am deceived or disappointed in - the wind, and it's Easterly, I take refuge here. The Growlery is the best-used room in the house. You are not aware of half my humours yet. My dear, how you are trembling!'
John Jarndyce explains the need for his Growlery in Bleak House to Esther Summerson (the 'said I' in the above); from Chapter VIII, Covering a Multitude of Sins in Charles Dickens' Bleak House.
![]() |
| Top piece of said pine tree that bounced off the roof my vehicle |
On the May Victoria Day weekend in 2022 one of the most powerful storms in Canadian history swept through Ontario and Quebec, extending 1,000 km from Windsor in the west all the way to Quebec City in the east.
Back in the fall of 2021 I had started to take a serious interest in trees and how to model them. Strangely, experiencing this event, and seeing all the smashed and destroyed trees, deepened my fascination with them. There was something about seeing how all these seemingly solid, eternal things, could all be destroyed in a matter of seconds struck a chord. Yes, yes, I have a couple of chainsaws, I've cut down trees and cleared brush, I've seen logging, but this was different: it was wild, violent, and pitiless.
The Loonar Module doesn't completely reflect the entirety of Canada either. No layout can as they are all reflections of how the builder sees and experiences the specifics of their piece of the country and translates that into a layout. The Loonar Module's terrain is based on that found in some of my favourite haunts in Hastings County, Ontario, which are dominated by tall trees, extensive wild forests, rocks, rocks, and more rocks, and lakes. Oh, and loons of course :-) The whole story about a narrow gauge experimental test railway run by the Ontario Department of Lands & Forests is completely fictional, but with lots of inspiration from the real government department.
![]() |
| Final configuration of the Lost Ocean Line (dimensions in cms). I must admit this was a favourite which the Way Out Layout has not yet surpassed even though it was meant to. |
![]() |
| Early design work on the Havelock Yard layout in July 2023 |
The Havelock Yard layout came about because early in July 2023 I became obsessed with building some sort of nostalgic tribute to the real Havelock yard that I've visited since the 1970s. The track plan is an inglenook with some display tracks added so I could show off a few models of freight cars I've seen there over the years. The layout is operable, but I haven't finished the scenery. Ok, strictly speaking, I haven't really started on the scenery. There's something too personal about this layout that gets triggered whenever I make a start on scenery that causes me to stop. Maybe one day I'll figure out what that is. So even though this layout is also a personal statement, it has some sort of negative charge associated with it.
![]() |
| After 4 days of part time work I had the infrastructure for the 3 pieces for my entry to Le Grand Defi finished! A record of sorts for me. |
I started my entry for LR Presse's 'Le Grand Defi' in late February 2024. Although it was for a challenge, I instantly had an idea for an entry based on VIA's Sudbury to White River line, complete with RDC. I considered this a personal response to the challenge, and not some stereotyped concoction for contest purposes. I was quite energized as I built this thing and finished in record time for me, completing all three pieces by late April 2024. I still have this extended diorama as I don't have the heart to cannibalize it for parts.
![]() |
| Starting to play around with objects to size the Mt. Lowe trolley. Track planning came later when the trolley was finished. |
I was on some sort of high at the end of April 2024 and immediately began work on the Mount Lowe Layout, which was a layout I've had in mind building since 2013 or so and now I finally had an idea on how to proceed. However, unlike the other personal layouts I didn't start with a track plan, but with building a vehicle inspired by Thaddeus Lowe's personal trolley. I needed it to help figure out the curve radii and grades on the layout.
![]() |
| Photos from the early planning days on: Top: Community Garden | Middle: Tintin 2001 | Bottom: Inglenook Lake |
Which brings me to today, almost exactly five years after beginning the Loonar Module in September 2021, which started me on the path I'm on now. Right now I have 3 little layouts on the go. I think the Community Garden layout will proceed and get finished. It'll be my first true micro-layout, and not one that pushes the outer size boundaries as have my others. It's both a personal statement on a place I quite like, and has a number of technical and modelling challenges I'm quite interested in working on. The Tintin 2001 layout might be stalled for awhile as I think about how to panel the monolith pit. Inglenook Lake will likely proceed as I think it's going to be a deeply personal layout, possibly with a more serious feeling to it than either the Loonar Module, the Centennial Experimental Farm, or Mount Lowe.
![]() |
| Yet another sketch for an MCM-7 Taronna (aka Toronto) layout. |
The 500-lb gorilla lurking in the background is Taronna, my homage to the places and streetcars of Toronto that has yet to take off even though I've built many buildings for it, doodled many sketches, and acquired many streetcars. The Lost Ocean Line had some Toronto pieces incorporated; the ill-fated Alta Vista TC (for Transportation Commission) was a serious attempt at a Toronto layout, but it had so many design problems it was completely unworkable, and most importantly, was boring; and Taronna, the MCM-7 version of Toronto, is still just lines on paper. This layout continues to be parked. I have a Rapido TTC CLRV on pre-order to complete the streetcar fleet for this thing, so when it arrives in the far flung future I hope my thoughts will have settled on a way to proceed with the layout.
![]() |
| More sketches for Taronna |
![]() |
| Taronna thoughts continue to develop |
Thursday, July 16, 2026
Mount Lowe Micro-Layout in Voie Libre #126!
Sunday, June 14, 2026
A Short Biography of Thaddeus Lowe via the BBC
![]() |
| Here's the link to the podcast. |
As part of their A History of the United States in 100 Objects podcast series the BBC features the biography of Thaddeus Lowe - yes, that Thaddeus Lowe, of Mount Lowe Railway fame - in episode 4. His story begins at the start of the American Civil War, continues on through the creation of the Mount Lowe Railway, and ends with Michael Collins, Apollo 11 astronaut, orbiting the Moon. Give it a listen. You won't be disappointed.
Tuesday, March 3, 2026
Mid-Century Basement*
![]() |
| Popular Mechanics, Dec '54; Model Railroad With Sound Effects |
Sunday, January 18, 2026
Thursday, December 11, 2025
Just in time for Christmas
The Mt. Lowe layout emerges from the workshop for a Christmas appearance. Here's what it looked like around this time last year.
Wednesday, November 26, 2025
Of Painted Backdrops, Mt. Lowe, and E. L. Moore
![]() |
| One of the backdrops hanging from the curtain rod support ready for a photo shoot. |
I've been working on painting two backdrops to be used when shooting Mt. Lowe layout glamour shots. They're fairly big things: 30" x 40" illustration boards painted with artist's acrylics.
I haven't done these sorts of paintings before and was a little reticent about getting started. At first I thought maybe I should get a couple enlargements made of photos I took on the Mt. Lowe trail to use as backdrops, but gave up on that because they wouldn't look right. They'd be 'photo realistic' and the layout would be 'craft realistic'. The two forms of realism wouldn't go together.
I finally realized that even if my backdrop paintings were rough-and-ready things it didn't matter too much because in any given photo not much of the background would be visible. There'd just be hints of sky and distant mountains. Once I realized this I didn't have any problem diving in and having a go.
![]() |
| The second backdrop. |
The skies are just loose mixes of Liquitex cobalt blue and titanium white acrylic tube paints. For the mountain profiles I first troweled on some Golden brand Fiber Paste to give them some texture as I didn't think I could create convincing textures with paint alone. Once the paste was hardened I painted on colours I used on the layout's mountains. When that was dry I applied some thin washes of cobalt blue to create a little aerial perspective.
![]() |
| Backdrop painting E. L. Moore used for his Canal Boats article. |
This work on backdrops got me thinking about the backdrop work E. L. Moore did for his photo setups, especially the one I think he used for his unpublished Canal Boats article. I still don't know if he painted this one or any of the others he used over the years. I wouldn't be surprised if he did, but I don't have any supporting evidence.
![]() |
| A Gemini colourization of the Canal Boats backdrop painting. |
Tuesday, November 11, 2025
Test photo for glamour shots
![]() |
| A test shot for composition with the partially completed backdrop |
I've been working on painting a backdrop for when I take glamour shots of the layout. This is the first time I've tried my hand at backdrop painting. I'm using acrylics on a piece of 30" x 40" illustration board.
Normally when playing with this layout it would be set up opposite the couch in the family room so there wouldn't be any backdrop present. This is purely so I can take photos of scenes I have in my mind.
![]() |
| Early sky layers |
I see a lot of things to tune-up in the photo, but I'm liking the direction things are heading. I have a vision of the adventure I'd like to see in these photos, and I'm getting more positive that I'll be able to realize it.
Friday, October 31, 2025
A base for the Mt. Lowe layout
![]() |
| The layout on the base mock-up. |
Before starting on shooting layout glamour photos I thought I'd finish building the mockup for the base. Who knows, maybe this will become more than a mockup and be the actual base.
![]() |
| Trefoil base plates are rough cut with a Japanese handsaw. |
When I set aside base construction last year I had the three tubes cut out and covered with that wood grain contact paper for a 70s Radio Shack look. The trefoil tube arrangement supported the layout quite well.
![]() |
| Marking the location of the bearing on a foam plate. |
Sometime last year Galen suggested mounting the layout on some sort of bearing so it could be turned around for better viewing. I was intrigued by that idea, but I had to resolve a few problems before it became viable. First was the layout had a power cord sticking out of it for plugging into a controller. If it were to rotate, the layout couldn't have any external power or control cables coming out of it. In keeping with the 70s vibe I decided to build in a battery powered controller to solve that problem. With the benefit of hindsight I'd probably make use of an external wireless controller in future projects.
![]() |
| Plate edges were shaped with a rasp and smoothed with a sanding block |
Then there was finding a suitable turntable bearing. The one I eventually settled on is a bit of overkill as it's rated to support a 750 lb load (!), but it cost less than $30 and had the diameter I was looking for, so the decision was easy.
![]() |
| Exposed portions of the base plates are painted with black acrylic. |
For awhile I thought I'd use plywood or chipboard for the base's trefoils, but 1" thick foam sheets that are used for house insulation won out. The load to be supported is minimal (I should weigh the layout, but I'll simply comment that it is "quite light" ) and this material is good enough for supporting light loads like those often encountered with micro-layouts. It's easy to work with too. All I ever use is a small handsaw for rough cutting, a rasp for final shaping, and a small sponge sanding block for smoothing edges.
![]() |
| Transfer tape was used to bond the turntable bearing to the foam plates. |
Finally, in the mockup spirit, I decided to bond the bearing to the foam trefoils with transfer tape. The tape provides a surprisingly strong bond. I've used it extensively in layout construction, so I thought I'd use it here too to make construction quick and easy.
![]() |
| Top and bottom plates have been bonded to the turntable bearing. |
The bottom of the base panel that rests on the floor has a some anti-slip material bonded to it. Again, I used transfer tape for this. The part I haven't figured out is how to attach the layout to the tubes. If someone bumps the layout, it could take a heartbreaking tumble. Of course, if the layout were attached to the tubes the whole thing could still be tipped over because it's rather top heavy. I might need to add some weight inside those tubes to try to make that harder to do. Well, that's what experiments and mockups are for: finding out this sort of stuff.
![]() |
| Anti-slip material is bonded to the bottom of the base |
Well, that's basically it for construction. The tubes were stood on the base and temporarily held in place with good, old duct tape. Here's a video of me 'taking the base out for a spin':
Saturday, October 25, 2025
Done
Friday afternoon, while I was in the workshop installing the final trolley wire support arm, I had a feeling come over me that the layout was now done. Done in the sense that all the things I wanted to appear on the layout were now in place, the trolley ran, and the layout could be shown to civilians in the right setting.
The old saying that a layout is never really done I can see applying here even though I've declared the layout done. There'll still be primping, tuning the details here and there, and maybe even adding some minor ones. And there's the stand that needs finishing, but it's the stand.
So, it's done.
Genesis of a Micro-Layout
This layout has been a long time in the making. I first had the idea of building something inspired by the Mt. Lowe railway back in 2014 after a stay in Pasadena. However, I had no idea how to proceed.
In the spring of 2015 we visited the Los Angeles area again and I was able to hike a portion of the Mt. Lowe trail in the San Gabriel mountains which runs along the old roadbed of the Mt. Lowe railway. Bad weather and scheduling constraints prevented me from hiking the entire route.
Throughout 2015 and 2016 I toyed with the idea of building a Mt. Lowe inspired layout in N-scale. Strangely enough as a test piece for the layout I built a model of the railway's observatory. Nothing else came of that layout idea.
It wasn't until January 2020, just before the pandemic, that I was able to return to Mt. Lowe and resume hiking the trail. Again, I was only able to hike part as ice and snow made the trail a bit too risky for me. Near the end of that trip I caught what we now know as covid-19, but at the time no one knew exactly what it was. I had a miserable flight home and from news reports we watched I expected to be quarantined when we landed in Montreal. That didn't happen, but I was so sick I stayed home for about three weeks.
In the fall of 2023 after reading a few interesting pieces by Bill Schopp on trefoil shaped layouts in some old Railroad Model Craftsman magazines a light went on in my head and I finally had an idea on how to build a layout that captured what I wanted to express, and wouldn't take years and years to construct. By this time I had also dabbled with micro-layouts for a few years. My experiences with the Loonar Module and the Centennial Experimental Farm had opened my eyes to other forms and approaches that could allow me to express things I previously found inexpressible.
Instead of starting with an observatory I wised up and started the layout by building a trolley inspired by Thaddeus Lowe's personal trolley. The scale was S and the gauge 9 mm. It took a lot of thinking before I settled on that scale and gauge. Things like how I could build a viable trolley from commercial drive units, support tight curves on the layout, deal with steep grades, availability of figures and scenic accessories, provide adequate clearances, and so forth factored into the decision. By starting with the trolley this gave me a vehicle to test grades and curves to see how steep they could be on the layout, and assess what sort of clearances and dimensions I'd need. This was very important, so much so that I'm thinking of writing a future post on general trefoil layout design principles and the necessity of testing designs with rolling stock.
In June 2024 I finally made a serious start on the layout. By the end of June the track was installed and the trolley could run along it. And, you may not believe it, but the area of the layout's footprint is 4 square feet, the upper limit on micro-layout size.
Building up the terrain was a long process. The big new technique I learned on this project was casting rock molds from latex and later using them to create the layout's rocky terrain. The mountains' basic form though was built up from styrofoam sheets. By August 2024 the final shapes were starting to emerge; by September the shapes were defined enough to begin solidifying the mountain structure and do final shaping with spray foam.
October 2024 was more-or-less dedicated to surfacing the mountain with Cel-U-Clay, making use of the latex rock molds. Creating the mountain surfaces was a big job and continued well into December. I kept working on the mountains into January of this year, but by this point I was wrestling with painting the mountains as shaping them was wrapping up.
You know, for a guy who considers himself a structures guy, I didn't start building structures until February. I started with the station at Poppyfield Flats because it seemed the simplest to me, and then went on to build the lookout at Inspiration Point, and then what I considered the most difficult structure, the Circular Bridge. The last structure, the Observatory, was almost an after thought to help sort out a design problem, unlike the observatory on the ill-conceived N-scale layout which was the first thing I built.
Amongst all the structure building there was a considerable amount of tree 'manufacturing'.
Later, much, much later, I built a simple passenger car for the trolley to pull.
Interspersed amongst all these significant projects was a lot of detail work. There was construction and installation of trolley wire support poles and arms, trolley wire installation, tree installation, layering on of ground cover and bushes, and lots of odds-and-ends work that is too persnickety to write about.
Again, much later during construction, in August, I changed my mind on how the layout should be powered and controlled. At first I merely provided a power jack for an external controller to plug into, but came to think the controller's power cord would inhibit play. I then scratchbuilt a battery-powered controller into the side of the layout so it would have stand-alone power and control. On a future project maybe utilizing some sort of wireless handheld controller would be better.
Now, all this may make it sound like I had a master plan right from the get-go and simply followed it to the end without any hiccups. I did have plans at the beginning. I wouldn't start a project like this without them, but once I got started there were lots of detours, changes of mind, conundrums that left me stumped for awhile, times when I just stared at the layout and thought about its design, mistakes, fumbles, and realizations about things I'd do different next time. Many of them are documented in the posts that can be found stamped with the Mt. Lowe tag. Some I'll take to the grave :-)
What's Next
Taking photographs to capture what's in my mind's eye is on the horizon and could last for a few months. Then there's the lead up to Christmas. I want the layout to be looking and behaving its best so I can show it off during the holiday season.
Friday, October 24, 2025
Dante's Staircase
Wednesday, October 22, 2025
Monday, October 13, 2025
Crossing the Circular Bridge
Sunday, October 12, 2025
Six Seconds in the Mountains
Wednesday, October 8, 2025
27 Trees
![]() |
| Layout cranked up to nearly the ceiling. |
When I work on my little layouts I do so at a standing desk that I've put on wheels, equipped with a 2' x 4' hardboard top, and has a crank so I can move that surface up and down. It comes in quite handy when it's time to add scenery as I can crank the top surface up and down as well as turn the whole thing to various angles since it's on wheels. This allows me to get a variety of views while I'm adding things.
Over the last few weeks I've been adding trees to fill out the scenes. There're 27 in total. Funny thing is back in May I thought I had made too many trees! Turns out I was right and wrong. I had a few too many tall ones and not enough small ones, so I had to make some little trees to balance out the scenes.
![]() |
| The other side. |








































.jpeg)



