When we were in Los Angeles last month, we made a special side-trip up the Angeles Crest Highway to hike on Mt. Lowe. Long story short, unlike last time, I hiked it, but afterwards regretted it.
Although it was sunny in the mountains, with temperatures in the mid to high 50s, parts of the trail that were in shadow were covered in rotten snow. Also, many trail sections had loose debris from slides. Often the trail was no more than around 12" wide with quite a drop on one side.
When I was finished and back on the main trail I had an overwhelming feeling that I'd done a stupid thing, and was lucky to be back without incident. That night and the next I had nightmares about slipping off the trail and into the canyon. My mountain days are over. I'm sticking with the beach :-)
Monday, February 24, 2020
Friday, February 21, 2020
Sliding back wall
I built-up a sliding back wall for the highrise.
It's fairly easy to make. There're 3 layers: there's an inner piece of black mat board, a middle layer of 0.100" styrene strips to act as a spacer layer, and an outer layer of black foam board. There's a track on the back ends of the side walls - it's those white strips in the photo - made from 0.080" square styrene that the back wall slides into. In the photo the wall is partially slid up to reveal the lobby and lower floors, but the entire wall can be slid out to expose all the floors.
After pondering things a bit, I need to build up the lobby next so I can get the bottom of the building firmed up and detailed.
The back wall isn't going to be left as raw foam board, but will be finished simply with styrene brick sheets and a few detail items. The details won't be prototypically accurate, just suggestive so that a casual glance isn't too jarring.
It's fairly easy to make. There're 3 layers: there's an inner piece of black mat board, a middle layer of 0.100" styrene strips to act as a spacer layer, and an outer layer of black foam board. There's a track on the back ends of the side walls - it's those white strips in the photo - made from 0.080" square styrene that the back wall slides into. In the photo the wall is partially slid up to reveal the lobby and lower floors, but the entire wall can be slid out to expose all the floors.
After pondering things a bit, I need to build up the lobby next so I can get the bottom of the building firmed up and detailed.
The back wall isn't going to be left as raw foam board, but will be finished simply with styrene brick sheets and a few detail items. The details won't be prototypically accurate, just suggestive so that a casual glance isn't too jarring.
Wednesday, February 19, 2020
Highrise structure cleanup
After staring at the model for awhile, I figured it needed a bit of strengthening here-and-there, and a little touch-up before moving on with new tasks.
A number of the glued joints were reinforced. A ceiling for the top floor was added as well as a roof cut from 0.100" styrene. I thought that floor didn't need a ceiling, and a roof was all that was required, but after viewing the top floor from a few angles it was clear that it would look unfinished without its own ceiling.
Also, the outside corner verticals were added since the wall joints looked and felt ok. While I was at it, I touched up some paint on a few other verticals that had gotten abraded.
Work on the back wall and exterior detailing are next. The model is standing on the corner of my desk with the open side toward me. I'm hoping that by looking around inside long enough I'll develop some ideas about interior detailing.
A number of the glued joints were reinforced. A ceiling for the top floor was added as well as a roof cut from 0.100" styrene. I thought that floor didn't need a ceiling, and a roof was all that was required, but after viewing the top floor from a few angles it was clear that it would look unfinished without its own ceiling.
Also, the outside corner verticals were added since the wall joints looked and felt ok. While I was at it, I touched up some paint on a few other verticals that had gotten abraded.
Work on the back wall and exterior detailing are next. The model is standing on the corner of my desk with the open side toward me. I'm hoping that by looking around inside long enough I'll develop some ideas about interior detailing.
Tuesday, February 18, 2020
More Walthers E. L. Moore kits
Discovery continues. It looks like Walthers also markets the Machine Shop (931-916) and a version of W. E. Snatchem called Two-Story House (931-901) in their series of Trainline kits.
I also see a Walthers kit called Hardware Store (931-915), which looks like a repackaging of AHM kit 5883, F. C. Rode Hardware Store, which in turn is also a variation on W. E. Snatchem. The Walthers site states the Hardware Store is in-stock, but will be discontinued when sold out - an ominous sign for the E. L. Moore aficionado.
There might be more kits of E. L. Moore origin out there - I need to find my hiking boots :-)
I also see a Walthers kit called Hardware Store (931-915), which looks like a repackaging of AHM kit 5883, F. C. Rode Hardware Store, which in turn is also a variation on W. E. Snatchem. The Walthers site states the Hardware Store is in-stock, but will be discontinued when sold out - an ominous sign for the E. L. Moore aficionado.
There might be more kits of E. L. Moore origin out there - I need to find my hiking boots :-)
Walthers version of E. L. Moore's Village Blacksmith
This is another stumble-upon that I found while looking for Walthers Car Shop kit. That Walthers Old Country Barn kit (#931-902) looks identical to AHM 5872, Village Blacksmith, that was based on an E. L. Moore project. If I'd known about the Walthers version back in November when I was at the Syracuse show, I wouldn't have worried about finding an AHM kit to repair my old model. Live and learn.
Subscribe to:
Posts (Atom)




