Tuesday, December 8, 2009

Roofs go up at Jones

I spent some time on the weekend installing the roofs on the Jones Chemical Company.

Here's the roof for the tank pad in a partial state of construction:

Basically, it's a 0.040 in sheet of styrene, cut to the shape specified in the article, with a piece of fine sandpaper glued to one side to simulate roofing material. Mr. Moore recommends two things that I didn't follow: 1) giving some three-dimensional shape to the roof, and 2) covering it with thinned glue and sprinked with fine stone. I closely examined the pictures in his article and his roof looked flat, so I'm not sure if he built it as he described, or if the perspective of the photos distorted the shape of the roof. Also, I though sandpaper was easier to apply. To get the sandpaper to stick, you'll need to lightly sand the styrene sheet before coating with a thin layer of white glue. To keep the whole thing flat while it dried, I sat my 12v marine battery on top. When dried, I edged it with thin styrene angle.

Here is the test fit of the roof to make sure everything is level. The vertical posts on the tank pad are made from 3 mm, square-section styrene. Since the tanks are different from those in the article, I had to arrange the posts a little differently, but tried to keep the same overall appearance. The biggest change is that I had to have 3 posts on the back instead of two so that there will be proper support for the inter-tank elevated walkway. I must admit that getting all the posts to the correct length was an exercise in trial-and-error sanding and fitting.

The tank pad roof is painted with a thinned, loosely mixed, wash of flat black and dark gray. The tv controller made a handy weight for holding the main building roof panel in place while the glue dried. These roof panels were also cut from 0.040 in styrene.

Here's a little closer look at the tank pad. The vertical supports are painted with Model Master acryl rust coloured paint.

Monday, November 30, 2009

Piping at Jones

Progress has been slow on the Jones Chemical Company. I've been busier than I thought I would be this fall, and there hasn't been a lot of time for model building. Anyway, I did find some time on the weekend to install the tank piping. The basic inter-tank connections are 1/8 inch piano wire bent to appropriate shapes as per the article. Corresponding holes were drilled in the tops of the tanks for seating the wires. Although a little hard to see in the picture, the small tank at the rear has a large diameter plastic pipe from a Walthers piping kit connecting the tank to the building. There is also a vertical pipe and valve from the same kit attached to the large diameter tan coloured tank.
I also added clear plastic to the windows and installed a view blocker in preparation for installing the roof. I had plans for adding a large horizontal tank with flashing LEDs inside the building to simulate a bubbling chemical tank, but with this project taking so long - longer than the Bunn's Feed and Seed - I decided to forego that idea and concentrate on wrapping up the project. Next part: installing the roof on the main building, and building the structure that covers the tank pad.


Wednesday, November 25, 2009

E.L.Moore industrial park?

I thought I'd think a little bit about how Jones' Chemical Company and Bunn's Feed & Seed would be positioned on the train board. After trying a few different configurations, a side-by-side layout along a siding looked the best. I'm going to mount them to a piece of 1/4 inch acrylic cut to fit into the centre section of the layout with its long sides parallel to the siding and to the highway. I thought the acrylic sheet would provide a stable base resistant to changes in temperature and humidity that occur in the basement. Also, I wanted the base to be sturdy enough to be removable so that the display could be used on a future layout, or as a stand-alone diorama. The windmill is a Walthers kit. It's a little weird placing it near these buildings, but I want to do something with the vertical elements in the scene, and I think this will make for an interesting contrast - although, I suspect its location may change before everything is finally placed in the scene.

Monday, November 23, 2009

New tanks for Jones

I haven't done any model building in awhile, but on the weekend I spent sometime fixing up the tanks. I decided to make due with material I had in the workshop for the new tanks. I no doubt could have found some 1 1/4 inch tube or pipe for exact replicas of those in the article, but I was lazy and thought it was more in the Moore spirit to use what was on hand. So, I built two tall tanks from 1 inch diameter aluminum tube and a third small tank - peeking out of the background at the back of the pad - from the same tube. Styrene caps were glued to one end of each tube and gaps were filled and sanded to get a uniform appearance. The aluminum tubing has a length-wise crease - it used to be part of a lamp - but when turned towards the building it is not noticeable. The next stage will be to add the piping.

Wednesday, November 4, 2009

Preliminary tank fitting at Jones


Mr. Moore recommends building the chemical tanks from 35 mm film canisters wrapped with paper and topped with a balsa cap. With digital photography the norm, it's hard to find 35 mm film cans anymore, so I thought some substitution was in order. According to the plans, the tanks have a diameter of 1.25 inches. I did some searching - as it turns out, not enough - and decided to use some 1.5 inch diameter, plastic sink tail-pieces cut to the length of the tanks specified in the plans. The problem turns out that at 1.5 inches in diameter, they are too wide and will require some major changes to the catwalk dimensions, as well as some basic changes to the layout of the tank facility, to get things to fit. Overall, I think to preserve the interesting appearance of Mr. Moore's design I'm going to go back to the drawing board and find some other tubes with 1.25 inch diameters. I should have followed the old adage - which, ironically, I always preach, but apparently don't heed :-(  - to "measure twice, cut once".