All buildings need some maintenance now and then; even little ones. I noticed the FORTRAN building had developed a gap where the right wall attaches to the front. I clamped it back together and carefully swabbed on some liquid glue for plastics. Once dry, some Micro Krystal Klear was smoothed over the bonded edges and then painted. That did the trick. While I was in a maintenance mode I added a roof over the front doors. I'd hate to have to stand out front in the rain and not have some protection :-)
No comments:
Post a Comment